Skip to main content

Drift Onsen Villa Estate Ready For Construction

By 14th April 2021June 1st, 2021Development, News, Niseko Real Estate

20,000sqm villa estate Drift in West Hirafu has completed all estate-wide infrastructure work in November 2020.

Construction of the first house (designed by AE5 Partners, pictured) due to commence spring 2021.

Developer Summit Developments, whose past projects include Skye Niseko and Terrazze Niseko, said the 14 exclusive lots are sold ready-to-build for villa development, ranging in the lot size from 212-633tsubo (702-2092sqm).

Each lot is equipped with Drift-exclusive natural onsen supply guaranteed before the onsen boring cap in the central Hirafu area. Lots are for sale from JPY181m.